Summary
The entrance bridge to Dushanbe National Stadium: PFM integrated the ribbon-form structure into the completed building through precise model nesting and on-site cutting, then delivered the full lighting scheme.
Summary
The entrance bridge to Dushanbe National Stadium: PFM integrated the ribbon-form structure into the completed building through precise model nesting and on-site cutting, then delivered the full lighting scheme.